Our Projects

Our Projects

 

Click below to view the galleries of previous projects

  • Claremont on the Park
    Claremont on the Park

     The Claremont on the Park project consists of two 7 level apartment buildings overlooking Claremont Oval. For this project Advance Formwork is responsible for: Formwork Concrete Pumping Concrete Place and Finish ; and Detail Excavation Expected Completion Date Dec’2017      ...

  • Leighton Beach, Lot 3, Buildings A & B – Built Construction
    Leighton Beach, Lot 3, Buildings A & B – Built Construction

      Advance Formwork has recently commenced its latest project, being a residential development on Leighton Beach foreshore.  It consists of two 6 storey apartment structures, with shared car park and podium levels. We are performing the formwork and concrete pumping and placement works.  And have a scheduled completion date of early 2017....

  • Stirling Cross Apartments (Innaloo) – Probuild
    Stirling Cross Apartments (Innaloo) – Probuild

      Mixed use development consisting of 3 multistorey structures (ranging from 6-9 levels) and a shared car park and podium level. For this project Advance Formwork is responsible for: Formwork; Concrete pumping and placement; AFS installation; and Pre-cast panel erection Completion date, late 2016....

  • Pinnacle Apartments – Jaxon Construction
    Pinnacle Apartments – Jaxon Construction

      Advance Formwork has recently completed this 20 storey, mixed use development project in South Perth. For the project Advance Formwork provided both the formwork and concrete pumping and placement services.  As a part of these works Advance Formwork provided to site: Two Zoomlion 33m, 4 stage, concrete placement booms; A self-climbed jump form for the main lift/stair core; and Self-climbed perimeter safety sc...