Our Projects

Our Projects

 

Click below to view the galleries of previous projects

  • Claremont on the Park – Broad Construction
    Claremont on the Park – Broad Construction

    Advance Formwork were engaged by Broad Construction to construct this apartment complex overlooking the Claremont Oval. The project consists of two 7 story apartment buildings with 2 basement levels, for a total area of over 48,000 m2. For this project Advance Formwork were responsible for: Formwork; Concrete Pumping; Concrete Place and Finish; AFS installation; and Detail Excavation Advance completed this project in...

  • Leighton Beach, Lot 3, Buildings A & B – Built Construction
    Leighton Beach, Lot 3, Buildings A & B – Built Construction

      Advance Formwork has recently completed  a residential development on the Leighton Beach foreshore.  It consists of two 6 storey apartment structures, with shared car park and podium levels. For this project Advance provided all formwork, concrete pumping and placing services. The Mirvac development is a wonderful addition to the foreshore landscape and Advance are proud to have played our part in bringing t...

  • Stirling Cross Apartments (Innaloo) – Probuild
    Stirling Cross Apartments (Innaloo) – Probuild

      Advance Formwork completed the construction of this mixed use development consisting of 3 multistorey structures (ranging from 6-9 levels) and a shared car park and podium level in Innaloo in early 2017. For this project Advance Formwork was responsible for: Formwork; Concrete pumping and placement; AFS installation; and Pre-cast panel erection....

  • Pinnacle Apartments – Jaxon Construction
    Pinnacle Apartments – Jaxon Construction

      Advance Formwork completed this 20 storey, mixed use development project in South Perth in 2016. For the project Advance Formwork provided both the formwork and concrete pumping and placement services.  As a part of these works Advance Formwork provided to site: Two Zoomlion 33m, 4 stage, concrete placement booms; A self-climbed jump form for the main lift/stair core; and Self-climbed perimeter safety screens...